Installing subway tiles in your home can be a DIY project for those with some experience in home improvement or tiling. Here are some steps to follow when installing subway tiles:
Subway Tile Installation Tips & Tricks
-
Prepare the surface: Make sure the surface where you will be installing the subway tiles is clean, dry, and free from debris. If you’re installing the tiles on drywall, apply a coat of primer first.
-
Plan your layout: Before you start tiling, plan the layout of the tiles to ensure you have enough tiles and that they fit in the space properly. Use a level and a chalk line to create a guide for where the tiles will be placed.
-
Mix the mortar: Mix the mortar according to the manufacturer’s instructions. Use a notched trowel to spread the mortar evenly on the surface.
-
Install the tiles: Start at the bottom of the wall and work your way up. Place each tile on the mortar, using spacers to ensure even spacing between the tiles. Cut tiles as needed to fit around edges or corners.
-
Let the mortar dry: Allow the mortar to dry for at least 24 hours before applying grout.
-
Apply the grout: Mix the grout according to the manufacturer’s instructions. Use a rubber float to apply the grout, working it into the spaces between the tiles. Remove excess grout with a damp sponge.
-
Clean the tiles: Once the grout has dried, use a clean, damp sponge to wipe away any remaining grout haze.
Following these steps can help ensure a successful installation of subway tiles in your home. However, if you’re unsure about taking on the project yourself, it’s always a good idea to hire a professional tile installer.
Make an enquiry below: